Thursday, February 10, 2011

Kopane Bridge construction



For many years the constriction caused by the Kopane Bridge over the Oroua River has set the level of flood protection afforded to this area. The Regional Council has recently acquired the consents and funding to replace the old Kopane Bridge with a new bridge and to realign the Rongotea Road.

At present there is a low spot in the flood protection work just up river from the bridge so that over-topping of the banks happens in a controlled manner. Excess flows are diverted overland to the Taonui Basin. Once the work is completed the potential level of flood waters in the Basin will be reduced.

The project is costing $4.3M and is expected to be completed by April 2012.

No comments: